//Trail Status mouse over Java // Upcoming Trail Work

Author Topic: Upcoming Trail Work  (Read 121793 times)

rangelinenaturepreserve

  • Moderator
  • Should be riding....
  • *****
  • Posts: 764
  • One is never truely lost when on two wheels.
    • View Profile
Re: Upcoming Trail Work
« Reply #210 on: April 05, 2018, 09:32:21 PM »
Just a reminder of the trail work day Saturday April 7th. No rain in the forecast. Whoohoo!  Meet in the RNP parking lot 9am. I have the materials. Most of it is 10 foot long so man-power is needed to place it. 40F and mostly sunny. Sun adds 10F, so it will feel like 50F.  That will be great for manhandling lumber.
 Please bring staple guns (for T50 staples), cordless drills/impact, water, and lunch.  If you have a 4 wheel drive truck, please bring it (my van gets stuck on dewy grass on flat ground). Thank you in advance for your help.
If you wait for good weather to ride in Indiana you will be waiting forever.

rangelinenaturepreserve

  • Moderator
  • Should be riding....
  • *****
  • Posts: 764
  • One is never truely lost when on two wheels.
    • View Profile
Re: Upcoming Trail Work
« Reply #211 on: April 07, 2018, 09:32:20 PM »
Thanks to all those who helped out today. Great job guys and gal.  See pics here: https://facebook.com/story.php?story_fbid=2036872599675781&id=212642228765503
If you wait for good weather to ride in Indiana you will be waiting forever.

rangelinenaturepreserve

  • Moderator
  • Should be riding....
  • *****
  • Posts: 764
  • One is never truely lost when on two wheels.
    • View Profile
Re: Upcoming Trail Work
« Reply #212 on: April 17, 2018, 01:11:42 PM »
Last work day of the year for structural repair is scheduled for Saturday April 28th to repair Teeter Totter Bridge.  This will be very similar to The Pier repair performed a couple weeks ago. A good turnout made that job go fast and easy.  Let's do the same for TT Bridge. With enough help, we can add a better entrance to the bridge so it's rideable for a broader range of skill levels.
Meet in the RNP parking lot at 9am. 
Tools needed:  staple guns for T50 staples (I have staples), cordless drills/impact drivers. 
What to bring: water, lunch, work gloves. 
Thank you.
If you wait for good weather to ride in Indiana you will be waiting forever.

 

Important Links

Join HMBA

 

Calendar

 

Trail Guide

 

Links