Work day scheduled for Saturday March 31st to repair The Pier. Meet in the RNP parking lot at 9am.
The Pier has a few runners and a stringer that needs replaced. This will be difficult since the lumber needed is 10 foot long pieces. Need as much help as we can get to haul in the materials and complete the repair.
Tools needed: staple guns for T50 staples (I have staples), cordless drills/impact drivers.
What to bring: water, lunch, work gloves.