1/10: 3hrs clearing trail of broken limbs and low hangers from snow storm.
1/14: 0.5hrs clearing trail of broken limbs and low hangers from snow storm.
3/23: 2.5hrs Met with Mounds Greenway Outreach Manager. Discussed the proposed Greenway and RNP.
4/9: 9.5hrs
1. Made log crossing out of fallen tree on E3
2. Removed low hanging tree on Intermediate between entrance and exit of E2
3. Removed fallen tree on novice where it merges with Intermediate
4. Installed new arrow post at merge of Intermediate and Novice
5. Installed new arrow post where Novice crosses gravel road
6. Installed new chicken wire on wooden banked turn on Novice
7. Trimmed part of E5
8. Installed new arrow post at 2nd turn
9. Reinstalled arrow post at 2nd creek crossing
10. Reinstalled arrow post at beginning of E4 and added "No Horses" to it
11. Installed "No Motorized Vehicles" sign at river
12. Fixed lock on Oakland Street gate.
6/3: 5 hrs mowed field crossings, mowed some trail, snipped some faceslappers, mowed the parking lot.
6/4: 5.5 hrs loppering and mowing E5
6/18: 8.5 hrs mowing and weedwacking trail. And removed big fallen tree on E3.
6/28: 2.5 hrs clearing fallen trees from storms
7/22: 4.5 hrs clearing more fallen trees from E1, weedwacked Novice to Oakland Rd.
9/5: 2 hrs removing fallen trees from storms
9/16: 2 hrs removing fallen tree from storm and band-aiding the gap jump.