The Limekiln Connector and Weedpatch will greatly improve connectivity throughout the trail system.
Currently beginner and intermediate riders either need to take the road or ride the expert level Walnut to connect to Limekiln. And HP is the only trail up and down between the North and South trails.
The Limekiln Connector will allow riders to connect Limekiln to the rest of the trails, by crossing the road and heading North. It will connect to Weedpatch which will run along the upper part of the Ridges and connect Aynes to HP.
These trails will be intermediate level trails and could be hand or machine built. Cost to Hand Build would be $20k due to some of the drainages required to cross. The trails could be machine built at an estimated cost of $75k. Hand build trails would be similar to HP or North Tower, and machine built would be similar to Limekiln.

