//Trail Status mouse over Java // Report Trail Issues

Author Topic: Report Trail Issues  (Read 104603 times)

JCampbell

  • **
  • Posts: 100
  • GT Sensor
    • View Profile
Re: Report Trail Issues
« Reply #75 on: July 24, 2018, 09:00:20 PM »
Big tree down on the Shelly climb.  It's just one main trunk resting on the trail, but it's close to 2 foot in diameter so more than one person may be needed.


N39° 10.945' W86° 14.818'
This tree is still on the trail and now there is a second tree about 1/4 mile down hill of it.  The second tree is about 20" diameter, single trunk, suspended 4-5 inches above the trail.

Mahk

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 210
    • View Profile
Re: Report Trail Issues
« Reply #76 on: August 04, 2018, 06:50:02 PM »
Cleared Schooner from Ogle Lake Road to the Hoosiers Nest end, and one from the HP end of Walnut.
« Last Edit: August 04, 2018, 06:59:20 PM by Mahk »
CERTIFIED FINANCIAL PLANNER™ professional.  
More info: www.facebook.com/MarkAdamsCFP/

Unfit Nitwit

  • Guest
Re: Report Trail Issues
« Reply #77 on: August 14, 2018, 08:21:35 PM »
I cut the two trees on North Tower.

Mahk

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 210
    • View Profile
Re: Report Trail Issues
« Reply #78 on: August 15, 2018, 07:07:21 AM »
Thanks Ed!!
CERTIFIED FINANCIAL PLANNER™ professional.  
More info: www.facebook.com/MarkAdamsCFP/

Unfit Nitwit

  • Guest
Re: Report Trail Issues
« Reply #79 on: August 19, 2018, 05:47:22 PM »
Tree on North Gate at the bottom of the downhill coming from North Tower. Elevated and will need a chainsaw. Was told of another down on Green Valley, but I didn't get a location.

Mahk

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 210
    • View Profile
Re: Report Trail Issues
« Reply #80 on: August 22, 2018, 08:40:22 AM »
Spectrum Trail Design took care of the tree on NG
CERTIFIED FINANCIAL PLANNER™ professional.  
More info: www.facebook.com/MarkAdamsCFP/

Dan71

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 439
    • View Profile
Re: Report Trail Issues
« Reply #81 on: August 24, 2018, 08:16:02 PM »
Tree at least foot in diameter fell across Green Valley.  Riding clockwise near top of downhill section before the bridge with skulls.  About quarter mile before the skull bridge.

Steve King

  • Global Moderator
  • Should be riding....
  • *****
  • Posts: 340
    • View Profile
Re: Report Trail Issues
« Reply #82 on: August 24, 2018, 09:47:08 PM »
Also a tree down on Aynes right before the climb heading towards the South end of the Park (but still in the valley)

39°10'42.6"N 86°13'53.0"W
39.178500, -86.231394


Mahk

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 210
    • View Profile
Re: Report Trail Issues
« Reply #83 on: August 28, 2018, 10:41:30 PM »
Aynes and GV have been cleared.
CERTIFIED FINANCIAL PLANNER™ professional.  
More info: www.facebook.com/MarkAdamsCFP/

Dan71

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 439
    • View Profile
Re: Report Trail Issues
« Reply #84 on: September 03, 2018, 06:41:50 PM »
The air conditioning between pine loop and the camp ground is blowing hot humid air, needs fixed. 

MattW

  • Training wheels on
  • *
  • Posts: 24
    • View Profile
Re: Report Trail Issues
« Reply #85 on: September 05, 2018, 06:39:16 AM »
Tree down on Green Valley.  I forgot to take a picture of the coordinates on my GPS.  Riding the trail in the clockwise direction, it is right in the middle of what I consider the first fun downhill section with flow.  I will get the coordinates off my GPS this afternoon if no one states that they already got this tree.  Going off of mtbproject's topographic map, my best guess would be somewhere in the 1.51 mile marker on the trail if you drag the mountain biker icon along the trail.

Mahk

  • HMBA-IMBA Member
  • Should be riding....
  • *
  • Posts: 210
    • View Profile
Re: Report Trail Issues
« Reply #86 on: September 05, 2018, 08:20:45 AM »
A group of us removed the tree on GV last night. 

Still hot and humid.
CERTIFIED FINANCIAL PLANNER™ professional.  
More info: www.facebook.com/MarkAdamsCFP/

MattW

  • Training wheels on
  • *
  • Posts: 24
    • View Profile
Re: Report Trail Issues
« Reply #87 on: September 05, 2018, 03:09:08 PM »
Thanks Mahk!

JCampbell

  • **
  • Posts: 100
  • GT Sensor
    • View Profile
Re: Report Trail Issues
« Reply #88 on: September 06, 2018, 11:32:11 PM »
Haven't ridden GV for a while, so sorry if this has already been reported.  The railing on the Green Valley 'skull bridge' has some broken supports, is leaning precariously, and looks about ready to fall off completely. The riding surface of the bridge seems fine, it's just the railing that's broken.

grayhound

  • HMBA-IMBA Member
  • Training wheels on
  • *
  • Posts: 34
    • View Profile
Re: Report Trail Issues
« Reply #89 on: September 11, 2018, 08:40:34 PM »
Trees down on GV- at the top of the second climb going CC at a trail sign, I think it was 13. Second one just after the bridge going CC.

 

Important Links

Join HMBA

 

Calendar

 

Trail Guide

 

Links