//Trail Status mouse over Java // Log your 2013 trail work hours here

Author Topic: Log your 2013 trail work hours here  (Read 4011 times)

rangelinenaturepreserve

  • Moderator
  • Should be riding....
  • *****
  • Posts: 763
  • One is never truely lost when on two wheels.
    • View Profile
Log your 2013 trail work hours here
« on: April 06, 2013, 04:21:47 PM »
3/15(date?): 2hrs met with CED's Executive Director Madison County regarding Mounds Lake
4/6:  7hrs disassembed wooden obstacles, loaded them into vehicles, delivered to park, partially reassembled
4/11:  2hrs went to Menards for treated lumber, lags, and deck screws for wooden obstacles
4/13: 9.5hrs reassembled wooden obstacles
4/30:  2.5hrs Mounds Lake meeting
5/6:  1.5hrs meeting with Economic Development Specialist regarding Regions Archery competition at RNP
5/14:  2hrs DNR commissioners meeting
6/1:  10.75 hrs mowing and weedwacking
6/2:  10hrs mowing and weedwacking, placed "no motorized vehicles" sign where quads are entering
6/8:  1.5hrs cutting stumps and branches with chainsaw
6/29:  7hrs cleaning up trash from Regions Archery tournament, blocked off their shooting lanes, chicken wired banked turn
7/5:  2hrs trimmed trail and marked areas on map that need trimmed
7/6: 5hrs trimmed trail
7/10:  5hrs preparing for Rampage - gathered and loaded materials and tools in van, went to Menards
7/11:  9hrs preparing for Rampage - filled mudholes, weedwacked, trimmed trail, mowed
7/12:  10hrs filling mudholes, repairing obstacles in skills area, removing fallen debris from trail, marking race course with ribbon and tape
7/13:  9hrs working the rampage race
10/9:  1.5hrs meeting with White River Bicycle Coalition (WRBC)
11/9:  6 hrs building log pile over fallen tree near gap jump, trimmed some trail while I had the chainsaw, dropped off bike rack and chained it to the message board
11/14:  3hrs attended City Council meeting with WRBC for Bicycle Friendly Community approval
11/16:  5hrs replacing temporary logs done on 11/9 with a permanent dirt ramp.  Returned tractor
11/17:  1.75hrs cut fallen tree off trail after first Novice bridge, cut tree off trail approx 1/2 way to Oakland Dr, cleared misc debris from storm
11/24:  4.5hrs cleaning up storm debris, built log pile from storm debris on lower Expert section
« Last Edit: November 24, 2013, 03:59:59 PM by rangelinenaturepreserve »
If you wait for good weather to ride in Indiana you will be waiting forever.

Doogels

  • HMBA-IMBA Member
  • *
  • Posts: 122
  • Trail builder-Visionary
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #1 on: April 06, 2013, 05:11:21 PM »
Brad Douglas 4/6/2013- 6.5 hrs load trucks haul material to RNP unload and set up
                   10/9/2013-1.5 hrs White River Bicycle Coalition Meeting
                   11/9/2013-2 hrs reposition fallen tree before gap jump
                   11/13/2013- 1.5 hrs White River Bicycle Coalition Meeting
                   11/16/2013-4 hrs Sycamore tree ramp build for jump/drop
                   11/22/2013-2 hrs Ride in Anderson Christmas Parade
« Last Edit: November 26, 2013, 11:21:18 AM by Doogels »
To experience Nature is exciting! To experience Nature at high speeds through rolling terrain on a Mountain Bike...."Now that is Living!" Twitter @RNPmtnbker

rmknotts

  • **
  • Posts: 91
  • Ride like there is no tomorrow.
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #2 on: April 07, 2013, 12:17:35 AM »

11/24- 4 hours- Cleared trail of storm debris, built log drop/jump

11/16- 3 hours- Turned the fallen sycamore tree on expert 3 into a rollover/jump7/12- 4 Hours- Prepare trail for Rampage. Put up tape, fill holes, haul trash.
6/2- 8 hours- Trim and weed eat Novice, Intermediate, and Expert 2,3,4.
4/13 2 hours- Continued to set up features in the skills area. Primarily braced foot supports to make the features safe and ridable.
4/7- Ryan Knotts 6.5 hours. load and unload materials into trucks and set up at RNP.

« Last Edit: November 24, 2013, 08:27:38 PM by rmknotts »
2013 Trek Superfly 100 AL Pro
2011 Trek Speedconcept 7.2
1985 Schwinn Sport

"I can ride my bicycle with no handlebars"

haggard_back_woods_Todd

  • Training wheels on
  • *
  • Posts: 11
  • Rigid and Single, Just like life.
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #3 on: April 09, 2013, 09:43:53 AM »
Todd Autio: 3 hours - Delivered, unloaded, and positioned wooden obstacles.

john7722

  • Guest
Re: Log your 2013 trail work hours here
« Reply #4 on: May 04, 2013, 08:37:42 AM »
4/24/13
2 hr. Honey suckle removal
4/27  1 hr fixing broken skills area boards
5/3  5 hrs mowing, weedeating, fixing pier drop landing
5/13 3 hrs. Breaking Honeysuckle from trail
5/27. 2 hr picking up No Horse Signs and T-Posts & Hardware
5/31  2.5 hr putting up Horse signhs
6/1  10 hr weedeating
6/2  6 hr weedeating
6/3  3 hrs  Menards for materials, repair broken signage
« Last Edit: June 04, 2013, 11:52:31 AM by john7722 »

rangelinenaturepreserve

  • Moderator
  • Should be riding....
  • *****
  • Posts: 763
  • One is never truely lost when on two wheels.
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #5 on: June 02, 2013, 08:16:07 PM »
This entry is for Patty Russell

6/1:  8hrs lopping trail
6/2:  3hrs mowing skills area
6/29:  7hrs cleaning up trash from Regions Archery tournament, blocked off their shooting lanes, chicken wired banked turn
7/6:  5hrs trimmed trail with loppers and pruners
7/10:  1hr drove to Kirk's Bike Shop to pick up swag for Rampage
7/13:  8hrs working Rampage race
11/14:  2hrs attended City Council meeting with WRBC for Bicycle Friendly Community approval
« Last Edit: November 17, 2013, 09:06:34 PM by rangelinenaturepreserve »
If you wait for good weather to ride in Indiana you will be waiting forever.

DEANACE1

  • Training wheels on
  • *
  • Posts: 21
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #6 on: June 02, 2013, 08:20:11 PM »

6/2   4.5 hrs   Weedwacking Expert Trail
7/9   2.0 hrs   Mowed parking lot and skills area in prep for RNP Rampage
7/13 7.5 hrs Rangeline Rampage set up, event and clean up.
« Last Edit: July 13, 2013, 05:51:35 PM by DEANACE1 »

wabasso

  • Training wheels on
  • *
  • Posts: 43
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #7 on: June 03, 2013, 07:59:20 AM »
5/13 - 3hrs honeysuckle removal Expert trail
6/1   - 6hrs Novice & Expert trimming
6/29 - 5hrs clean up, archery
8/21 - 1.5hrs meeting with new forming Bicycle Coalition, Anderson
« Last Edit: August 22, 2013, 07:54:50 AM by wabasso »

AndyLee

  • Training wheels on
  • *
  • Posts: 23
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #8 on: July 13, 2013, 02:57:48 PM »
6/29- 5 hrs cleaning up after archery

Alex Sexton

  • **
  • Posts: 65
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #9 on: July 15, 2013, 07:42:53 PM »
Alex Sexton


7/13 - 5 hours volunteering at the time trial and riding the trails to clear the directional tape after the race was over.
Alex Sexton
2012 Trek Fuel EX8
2011 Cannondale Synapse
1982 Peugeot Course
"Only three things are guaranteed in a mountain biker's life: death, taxes, and scars from crashes!"

Doogels

  • HMBA-IMBA Member
  • *
  • Posts: 122
  • Trail builder-Visionary
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #10 on: November 09, 2013, 07:34:14 PM »
Bump
To experience Nature is exciting! To experience Nature at high speeds through rolling terrain on a Mountain Bike...."Now that is Living!" Twitter @RNPmtnbker

pmanderson

  • **
  • Posts: 50
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #11 on: November 17, 2013, 07:05:26 AM »
Patrick Manderson


10/19 - 1 1/2 hours blowing leaves
10/26 - 1 1/2 hours blowing leaves
11/03 - 1 1/2 hours blowing leaves
11/06 - 1 1/2 hours blowing leaves
11/09 - 1 1/2 hours blowing leaves and 1 hour at the sycamore jump on expert #3
11/16 - 4 hours at the sycamore jump on expert #3
« Last Edit: November 29, 2013, 11:37:10 PM by rangelinenaturepreserve »

Fstr_on2

  • **
  • Posts: 77
    • View Profile
Re: Log your 2013 trail work hours here
« Reply #12 on: November 25, 2013, 10:02:11 AM »
Andrew Eggebrecht


11-24-2013 4 hours cleaning up from storm
2010 Gary Fisher Cobia

 

Important Links

Join HMBA

 

Calendar

 

Trail Guide

 

Links