O’Bannon Woods and Harmonie State Park
HMBA Trail Blitz
Thursday, Dec 10th: 10:00AM Trail Layout at O’Bannon Woods State Park
Friday, Dec 11th: 10:00 AM Trail Layout at Harmonie State Park
Saturday Dec 12th: 10:00AM Trail Building at Harmonie State Park
Sunday Dec 13th: 10:00AM Trail Building at O’Bannon and 1:00PM Trail Ride
Alex Stewart, Spectrum Trail Designs; and Paul Arlinghaus, President HMBA will be leading a four day event to kick of trail expansion and O’Bannon Woods and Harmonie State Parks. Trail Layout will be the focus of Thursday and Friday’s efforts. Both Harmonie and O’Bannon have 6+ miles of trail that was built through the Governor’s 2008 State Trail Grant. And both properties are ready for expansion.
The trail layout sessions, provide the opportunity to spend a day doing trail design with Indiana’s primer trail designer. Alex Stewart designed the existing trails at Harmonie and O’Bannon, as well as most of the trails at Brown County State Park.
On Saturday and Sunday we will start building new trails. The intent is to get local trail builders started, so that they can continue building trails throughout the winter.
There will also be a ride at O’Bannon Woods State Park at 1:00PM. For the adventurous, we will show off a 5 mile section of the Adventure Trail that has been cleared of downfall and is available for riding.
Details
• Harmonie meeting location: Shelter at Mountain Bike Trail Head
• O’Bannon State Park location: Rocky Ridge Trail Head (Family Campground)
• HMBA will provide trail building tools.
• Contact Info: Paul Arlinghaus (317) 730 5046,
parlinghaus@msn.comPark Info and Property Map
http://www.in.gov/dnr/parklake/2981.htmhttp://www.in.gov/dnr/parklake/files/harmonie_trail.pdfWe will be meeting at the mountain bike trail head’s shelter. On the map link above it says future mountain bike trails. The trail work and layout will be extending the Walnut Connector, from where the blue line stops.
